Field Services

Project Engineering

Performance improvement projects: PESS has wide experience and knowledge in the design, development, and execution of projects to improve equipment in a power generation central. PESS develops the whole life cycle of each project, starting with viability studies, project development, design, engineering, and supply through the final execution.

Viability Studies

PESS aids the risk evaluation generating several alternatives that help in determining the adequate strategies to identify the keys securing benefits for the project.

Project Development

Given PESS vast experience; can provide a clear path for decision-making. Technical experience eliminates the uncertainty when proposing innovative solutions, processes, and tools to make the project become a reality. PESS has contributed to the development of cogeneration projects, wind turbine plants, and execution of improvement projects.

Engineering Design

For each project, PESS generates a complete set of detail and construction engineering drawings, significantly reducing the implementation time on site. Some of the projects include update in the gas and steam turbine controls, update of combustion systems, monitoring systems, intake air-cooling, and customization of energy facilities.

Project Execution

The PESS group of specialized field engineers contributes to the execution and development of each project. All of them are completely backed by the team of design engineers, which allows for the development of a good installation project. Field engineers are bilingual and are involved in the project during the engineering design phase, achieving to adjust to the schedules required by the industry.

PESS adds value in the following way:
  • Responsibility of the whole project, turn-key
  • Develop specifications during execution
  • Sense of responsibility
  • Latest technology used on all projects
  • Construction engineering documentation
  • Trained operators

Modernization of Gas Turbines

Improvement and revamping of power plants. PESS provides the help for the update of energy plants, besides giving the operators options of energy plants to reduce operational costs, increase production, and improve reliability and availability of equipment. The experienced team of PESS engineers is centered in improvements of gas turbines, steam turbines, and customization of the projects in centrals. Upgrades offered by PESS are:

Upgrade of Control Systems

PESS upgrades the control systems of gas turbines to achieve higher efficiencies and reduce the risk of loosing control of the turbine under operation. PESS PLC control upgrades incorporate technology in the control technique to achieve the maximum control of the processes, aid services, and piece availability.

Upgrade of Hot Gas Parts of Gas Turbines

PESS offers increasing efficiency and production of the gas turbine through the installation of the most recent parts in the turbines. Benefits of each unit depend on the present configuration of the gas turbines; increases can reach up to 10% in power production and improve heat rate 5%.

Increase of combustion temperature in gas turbines

The increase of the combustion temperature of the gas turbines is the main drive for efficiency: the higher the temperature, the cycle becomes more efficient. This temperature is limited though by the kind of material of the parts. When upgrading the hot parts of the turbine, PESS offers the increment in combustion temperature achieving a more efficient machine.

Upgrade of the combustion systems

PESS offers to upgrade the existent combustion hardware, with the latest technology in NOx emission to assure clients comply with environmental requirements without loosing the output power or efficiency in their machines.

Supervision of equipment systems

PESS’s experience in remote system monitoring, allows obtaining a better visibility of the whole process. This technology has demonstrated to improve reliability and availability of data, through the identification of the conditions; helping to avoid having a forced stop of the unit.

Intake air-cooling

Output power and efficiency of the gas turbine, extracts air from the environment to cool the air entering the compressor, customers can obtain a 30% increase in the output power, and 7% in heat rate.

Customization of Energy Plants

At each site, improvement projects can be applied, depending on the needs of each client. The team of engineers is specialized to provide integral solutions to improve performance and availability of the plant. Some examples of these projects are addition of an SSS clutch to a gas turbine, installation of a water compressor for gas turbine cleaning or the additional installation of an auxiliary generator. PESS has developed agreements with spare part and equipment suppliers in the United States and Europe. This vast supplier network allows executing the projects with efficient timing, and using the latest technology available in the market.

Mechanical Modernization, Parts and Equipment Supply

PESS develops the modernization of plants, focused on supplying solutions so clients can reduce operation costs, increase production, and improve reliability and availability of their equipment. The experienced engineering team at PESS is focused in gas and steam turbine modernization projects as in equipment adaptation projects. The list of PESS modernizations includes:

Control Systems Modernization

PESS supplies the modernization of obsolete control systems so operators can have a total process control and thus reduce the risk of loosing the control of the turbine. PESS’s modernizations to the control system are based on state of the art PLCs that allow having the maximum process control, technical support, and availability of parts and spares.

Modernization of the hot parts of the gas turbine

PESS offers to increment efficiency and production of the gas turbine through the installation of the most recent parts in the turbines. The benefits of each unit depend on the current configuration of the gas turbines; you can increment up to 10% in power production and improve heat rates by 5%.

Increment of the combustion temperature in gas turbines

Combustion temperatures in gas turbines are the main factor driving efficiency of the gas turbines. The higher the combustion temperature, the higher is the efficiency of the cycle. At the same time, the material of installed parts limits combustion temperatures.

Modernization of the combustion system

PESS modernizes the parts of the combustion system of gas turbines with the latest Dry Low NOx (DLN) technology to ensure that customers comply with environmental requirements without loosing power or efficiency.

Remote Monitoring Systems

PESS’s experience in machinery monitoring systems is maximized to obtain a complete remote visualization of the process. This technology has been proved to improve reliability, and availability of the equipment by identifying on time the process conditions that might cause damage to the equipment resulting in unexpected or severe damages to the equipment.

Intake Air Cooling Systems to the Gas Turbine

Power and efficiency of the gas turbine is improved cooling the air entering the compressor. Customers can achieve up to 30% power increase and 7% improvement in unit-calorific consumption.

Modification of Power Generation Plants

There are additional improvements that can be implemented at each plant, depending on the specific needs of the plant. The engineering team at PESS is prepared to supply an integral solution that improves the performance of the plant, its availability, and reliability. Some of these projects include for example the addition of a SSS clutch to a gas turbine or the installation of a compressor washing system. Expertise that helps eliminate uncertainty with innovative solutions, processes, integrated with tools to manage your assets. TM2500 Mobile Gas Turbines Generation Additional Power: By replenishing power by increasing demand or insufficient capacity for planned shutdowns. Network Stabilization: Reliably ensures network stability and providing reactive power to improve transmission network efficiency. Demand Peaks: Supports temporary demand for additional power and prevents power outages. Emergency Natural Disasters: Provides temporary power after unplanned emergencies. Unplanned outages: Temporary solution for network failures or unscheduled outages. Distributed generation Geographic Flexibility: Allows temporary power after unplanned emergencies to remote locations, rural electrification. Regional Substation: Provides additional capacity to remote substations or by zone.

Project Development

The vast experience of PESS in the development of generation plants and electric utilities projects, allows customers to eliminate doubts as for technical, legal, contractual, and economic details that could arise.

Some of the projects developed by PESS are:

  • Co-generation installation.
  • Combined cycle installation.
  • Wind Turbine Plant installation.
  • Industrial Energy Plants.

Our team can help you develop the following activities:

  • Co-generation installation.
  • Combined cycle installation.
  • Industrial Power Plants.
  • Complete development of a Business Plan for the Project.
  • Feasibility studies for the installation of the project, analyzing different technologies and configurations for the plant.

  • Technical and Economic Evaluation.
  • Risk evaluation and sensitivity analysis.
  • Estimation of human and operational capital.
  • Design of the generation plant.
  • Evaluation and selection of equipment specifications.
  • Technical assistance during the path to the acquisition of the plant.
  • Electricity cost analysis.
Some of the customers for these services include, investment banks, consulting firms, construction engineering companies, cogeneration plants, and service companies.

Automation for increasing regulation

Water & Wastewater SCADA and Control Systems

  • System capacity expansion and customization.
  • Professional project procurement specifications for the water wastewater industry.
  • Aging distribution system? Upgrade, and reduce down-time.
  • Maximize security and regulations compliance.
  • Reduce maintenance and operating costs, keeping water quality standard.
 

Project Development

With PESS process control and motor control solutions, you secure and optimize your operation. Expertise that helps eliminate uncertainty with innovative solutions, processes, integrated with tools to manage your assets.

Engineering Design

For each project, PESS generates a complete set of detail and construction engineering drawings, significantly reducing the implementation time on site. Compliance on the entire water cycle:
  • CONTROL ROOM
  • WATER TREATMENT PLANT
  • PUMPING STATION
  • SEDIMENTATION
  • COAGULATION
  • WATER STORAGE
  • IRRIGATION & WATER TRANSFER
  • WATER INTAKE
  • DESALINATION PLANT
  • PRESSURE BOOSTING

Project Execution

The PESS group of specialized field engineers contributes to the execution and development of each project. All of them are completely backed by the team of design engineers, which allows for the development of a flawless installation project. Field engineers are involved in the project during the engineering design phase, achieving to adjust to the schedules required by the industry.

Future Proof Integration

Super secure systems prepared to perform and communicate on multi-platform and internet of things (IOT) protocols. Best graphic HMI in the industry. With operator ergonomics design and optimized alarm management, button scaling and placement was awarded intensive thinking and testing, avoiding “flashy” and 3D graphics to focus on human attention-friendly colors and data displaying. Improved data analytics tools for easier maintenance management and multi-device usage. Scalable architecture with Connected Enterprise framework and standard secure Ethernet backbone.

Contact

If you want to get a quote of our services, have doubts about it or just want to send us a message, get in touch with us.

info@pess.com